Thought I would come and take a look in here to see what everyone thought of the Recall that I recieved notice of from Alt Energy Systems and realized that I never posted the resolution the the previously posted issue. Turned out after the inverter went back to Xantrex, they held it for a month waiting for info from me but never called to ask me for it. When I finnally called the check up, I found out the issue was simply that they last person to work on the inverter (someone from Xantrex) did not tighten the screws connecting the wiring box to the inverter and it was loosing its ground. Simply tightening those bolts with the star washers worked and the inverter has been fine ever since I got it back from them.
Now I am contemplating my next upgrade, connecting the 3kw Sunpower Positive Ground array to the 16 Us-Battery L16 type Deep Cycle cells that currently only has a 750watt array connected to it. From what I understand, the Xantrex MPPT 80 Charge Controller (due out in Q1 2011) should be able to handle the whole array. Im hoping to have it switchable between the charge controller and the original GT inverter that I have now. I need some new batteries too as the 13 year old batteries we have now seem to peak at about 25volts on a 24volt system, not good.