Joined: Fri Oct 17, 2008 8:07 am GMT EthGMT Posts: 24
|
I actually have 12 KC120's on a tracker. The dates on them is 2003.8 and I'm not having any problems with them YET. I have them on a MPPT charge controller that keeps the volts high and the amps low. Hopfuly this will keep the solder joints from overloading. Anyone know of any failures in the 2003 KC120's ?
My other three 12 panel trackers have KC130's on them. I probably have the largest solar power tracking system in Pinellas County, FL.
_________________ Tracking the SUN, in case it gets LOST!
|
|